Russian  English  All projects

Finalize the functionality of unloading databases of crm-system stage of testers



I would like to personally show the TK and discuss the details
(career guidance project)

Software stack of the project:
Apache MariaDB PHP 7.4 Perl Laravel 7

Objectives in total:

All points of the tasks have already been partially completed - there are improvements and testing left
1. supplement the existing functionality, namely a summary table with all the parameters of testing children on the platform
2. to unload this table from the platform to Excel
3. supplement the functionality of setting the parameters of the desired profile (so that later in the summary table the test results are colored according to the specified ones
criteria)

4. Supplement the functionality of the test builder
5. ensure the integration of the site on the tilde with the platform (so that the site on the tilde opens inside the platform, as well as for external users
without registration)

6. Testing phase
14.09.2022 19:12



 Answers freelancers